| Implemented a logistics distribution optimization system at G2M with significant savings in transportation costs.
Implemented warehouse manpower planning optimization at G2M with significant reduction in overtime.
VESTEL
Transportation planning system at Vestel was optimized and based on this simulation, closed warehouses in Adana, Ankara and Istanbul and moved to a single warehouse to optimize overall cost to the company.
ALTINYILDIZ
Implemented a planning module for yarn-dyeing operation to significantly increase on-time performance of the factory. |